Click here to make tpub.com your Home Page

Page Title: Replacement of Inner Boom.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-34-2-3
Replacement of Inner Boom.
h.
FRAME 1
WARNING
Inner boom (1) must be held up at sheave end when sliding
it into outer boom (2). If this is not done, outer boom can
tilt and cause injury.
Put chain sling (3) with spreader bar (4) in place at 12-FOOT MARK
1.
and 18-FOOT MARKS on inner boom (1) and join chain sling to chain
hoist (5) on A-frame (6).
Raise inner boom (1) to level of outer boom (2).
Soldier A 2.
As soldiers B and C walk inner boom (1) into outer boom,
3.
raise and lower inner boom to keep it from binding.
Walk inner boom (1) into outer boom (2) up to 18-FOOT MARK.
Soldiers
4.
B and C
Put safety jack under sheave end of inner boom (1).
5.
Lower inner boom (1) onto safety jack.
S o l d i e r A 6.
Move chain sling (3) to sheave end of inner boom (1) and take out spreader
7.
bar (4).
GO TO FRAME 2
17-588

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business