|
|
TM
9-2320-211-34-2-3
1.
P u t two pivot pin bushings (1) into outer boom (2).
2.
P u t two sheave assembly bearings (3) into sheave (4). Refer to Part 1,
para 7-7.
P u t in lubrication fitting (5).
3.
Do steps 2 and 3 again on other sheave.
4.
P u t sheave (4) with sheave assembly bearings (3) into place in outer boom
5.
( 2 ) and line up pin holes.
P u s h in pin (6).
6.
P u t in cotter pin (7).
7.
GO TO FRAME 3
17-582
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |