|
|
TM 9-2320-211-34-2-3
FRAME 6
Take out cotter pin (1).
1.
2.
Push out pin (2) and take out sheave assembly (3).
Take out lubrication fitting (4).
3.
T a k e out two sheave assembly bearings (5). Refer to Part 1, para 7-7.
4.
5.
Do steps 3 and 4 again on sheave assembly taken off during boom assembly
removal.
6.
Take out two pivot pin bushings (6).
GO TO FRAME 7
17-577
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |