|
|
TM 9-2320-211-34-2-3
FRAME 4
NOTE
Tag tube assemblies (1 and 2) so that they will be put back
in the right places.
Pull out tube assemblies (1 and 2).
Slide away two fittings (3).
1.
Cap open ports.
2.
Hook up chain sling and chain hoist (4) to hoist winch assembly (5) and
put tension on chain sling.
Take out six screws and lockwashers (6).
Soldier A 3.
Take out six screws and lockwashers (7). Hold support (8) before taking
Soldier B 4.
out last screw to keep hoist winch assembly (5) from shifting.
Tell soldier A when last screw (7) is taken out. Hold support (8)
5.
to guide hoist winch assembly (5) as soldier A lowers it to ground.
Soldier A 6.
L o w e r hoist winch assembly (5) to the ground. Unhook chain sling
and chain hoist (4).
GO TO FRAME 5
17-575
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |