|
|
TM 9-2320-211-34-2-3
FRAME 9
1.
Lower hoist until there is slack in chains (1 and 2).
2.
Unhook two chains (1). Unhook two chains (2) from 3-foot chain (3). Take off
3-foot chain.
Take off guide rope (4) and 4-foot chain (5).
3.
GO TO FRAME 10
17-566
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |