|
|
TM 9-2320-211-34-2-3
FRAME 9
Soldier A 1.
S t a n d at hoist controls (1).
S t a n d on wrecker next to left boom elevating cylinder (2).
Soldier B 2.
S t a n d on wrecker next to right boom elevating cylinder (3).
Soldier C 3.
Soldier D 4.
S t a n d at rear of wrecker and hold guide rope (4).
W h e n soldiers B, C, and D are ready, use hoist to lift boom
Soldier A 5.
a s s e m b l y (5) clear of boom elevating cylinders (2 and 3).
M o v e boom elevating cylinders (2 and 3) away from boom assembly
Soldiers
6.
Band C
( 5 ) and go to pivot pin end of boom assembly.
GO T'0 FRAME 10
17-556
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |