TM 9-2320-211-34-2-3
FRAME
4
Soldier A 1.
U s i n g two pieces of 1 /2-inch rope, tie two slings (1) around oil
reservoir (2) as shown.
2.
H o o k up chain hoist (3) to rope sling (1).
3.
T i e guide line (4) to rope sling (1).
4.
U s i n g chain hoist (3), raise oil reservoir (2) up off wrecker body
(5).
Soldier B 5.
G u i d e oil reservoir (2) from ground, watching soldier A as oil
reservoir is moved.
Soldier A 6.
U s i n g chain hoist (3), move oil reservoir (2) off truck onto ground.
GO TO FRAME 5
17-485
|