Click here to make tpub.com your Home Page

Page Title: Replacement.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-34-2-3
h.
Replacement.
FRAME 1
1.
Place board on pump support (1) between crane support assembly (2).
2.
Tie 5/8 -inch rope to pump assembly (3). Hook rope to hoist and lift pump assembly
onto board. Unhook rope from hoist.
3.
Slide pump assembly (3) and board into place over pump support (1) between crane
support assembly (2).
4.
Hook rope to hoist and raise pump assembly (3) off board. Take out board.
5.
Aline pump gearshaft (4) with coupling (5) and lower pump assembly (3) onto pump
support (1), alining holes.
Put in four screws and lockwashers (6).
6.
Take off caps.
7.
Put nut (7) on fitting on hose (8).
8.
GO TO FRAME 2
17-459

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business