|
|
TM 9-2320-211-34-2-3
d.
I n s p e c t i o n and Repair.
FRAME 1
1.
C h e c k that lead and ring assemblies (1, 2, and 3) and insulation rings (4, 5,
6 , 7, and 8) have no cracks or glazed or worn areas. Throw away damaged
p a r t s and get new ones in their place.
C h e c k that soldered connections (9) on lead and ring assemblies (1, 2, and
2.
3 ) , are not damaged. I f leads (10) are broken or not soldered to rings
( 1 , 2, and 3), get new leads in their place or solder leads to rings.
Check that cable connectors (11) are not damaged or broken. If connectors
3.
a r e damaged, throw them away and get new ones in their place.
END OF TASK
17-375
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |