|
|
TM 9-2320-211-34-2-3
FRAME 4
NOTE
Note order in which lead and ring assemblies (1, 2, and
3 ) are stacked to be sure they are put back in the same
place.
Take out screw (4).
1.
P u l l off ring (5), lead and ring assembly (1), insulation ring (6), lead and
2.
r i n g assembly (2), insulation ring (7), lead and ring assembly (3) and
i n s u l a t i o n rings (8 and 9).
END OF TASK
17-373
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |