|
|
TM 9-2320-211-34-2-3
FRAME 4
1.
Take two snaprings (1) off shaft (2).
2.
Take out shaft (2), sheave (3), two felt washers (4), and two thrust
washers (5) from frame (6).
3.
Press bearing (7) out of sheave (3).
4.
D r i l l pin (8) out of shaft (2). T h r o w away pin and get a new one. If
s h a f t (2) is damaged while drilling, throw away shaft and get a new one.
GO TO FRAME 5
17-32
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |