|
|
TM 9~2320-211-34-2-3
FRAME
4
P u t in felt ring (1).
1.
P u t in bearing sleeve (2).
2.
P u t on sheave swivel (3).
3.
P u t nut (4) on trolley assembly (5).
4.
Press bearing (6) into sheave (7).
5.
P u t in bushing (8).
6.
P u t in two felt washers (9).
7.
P u t in two lockwashers (10).
8.
GO TO FRAME 5
17-22
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |