|
|
TM 9-2320-211-34-2-2
FRAME 2
1.
P l a c e link of three-point chain sling (1) over hole in cab shield (2) as shown.
2.
P u t bolt (3) through link of three-point chain sling (1) and cab shield (2).
P u t on nut (4).
3.
D o steps 1 through 3 again at other side of cab shield (2).
4.
5.
H o o k third section of chain sling (1) on front of cab shield (2) as shown.
6.
H o o k three-point chain sling (1) to hoist equipment as shown.
GO TO FRAME 3
16-225
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |