|
|
TM 9-2320-211-34-2-2
FRAME 5
Soldier A 1.
W o r k i n g on top of fender (1), route wiring cable (2) through inner
f e n d e r wall. P u t on grommet (3).
Soldier B 2.
Working under fender (1), route wiring cable (2) between fender
supports as shown.
P u t two clamps (4) on wiring cable (2).
3.
Soldier A 4.
P u t in and hold screw (5).
Soldier B 5.
P u t on clamp (4) , washer (6), and nut (7).
Soldier A 6.
P u t in and hold screw (8) and ground strap ( 9 ) .
Soldier B 7.
P u t on clamp (4) and washer and nut (10).
GO TO FRAME 6
16-123
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |