|
|
TM9-2320-211-34-2-2
FRAME 2
Soldier A 1.
Using jacks (1), raise cross tube (2) into place under bogie support
brackets (3). Aline holes in each cross tube bracket (4) with holes
in bogie support bracket at each side of truck.
2.
Put four screws (5) through each bogie support bracket (3) and hold them.
Let wrench wedge against sides of bogie support bracket due to very
high tightness being put on nuts (6).
Soldier B 3.
Put on four nuts (6) at both sides of truck. Tighten nuts to 1200 to
1300 pound-feet.
Take out jacks (1).
4.
NOTE
Follow-on Maintenance Action Required:
1.
R e p l a c e rear spring. Refer to TM 9-2320-211-20.
2.
Replace torque rods. R e f e r to TM 9-2320-211-20.
R e p l a c e rear wheels. R e f e r to TM 9-2320-211-10.
3.
4.
Remove supports and lower truck chassis. Refer to
T M 9-2320-211-20.
5.
Replace fifth wheel assembly (truck M52A2). Refer to
T M 9-2320-211-20.
Lower safety braces (truck M51A2). Refer to
6.
T M 9-2320-211-20.
7.
Lower dump body (truck M51A2). Refer to
T M 9-2320-211-10.
END OF TASK
15-46
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |