Click here to make tpub.com your Home Page

Page Title: FRAME 5
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-34-2-1
FRAME 5
1.
W r a p a length of string (1) around retainer assembly (2) as shown. Join
s t r i n g to bearing preload scale (3).
2.
Using bearing preload scale (3), check preload. If new bearings were put in
r e t a i n e r assembly (2), preload must be 12 to 18 pound-inches. If original
b e a r i n g s were used, preload must be 4 to 8 pound-inches.
T a k e off string (1) and bearing preload scale (3).
3.
IF PRELOAD IS NOT WITHIN LIMITS GIVEN, GO TO FRAME 6.
IF PRELOAD IS WITHIN LIMITS GIVEN, GO TO FRAME 8
9-46

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business