Click here to make tpub.com your Home Page

Page Title: FRAME 3
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-34-2-1
FRAME 3
P u t toeboard (1) in place and aline holes. Put in 11 screws and lockwashers
1.
(2).
S l i d e rear tunnel (3) down into place and aline holes.
2.
P u t in six screws and lockwashers (4).
3.
4.
S l i d e front tunnel (5) down over shift lever (6).
A l i n e holes in front tunnel (5) with holes in cab floor, toeboard (1), and rear
5.
tunnel (3).
P u t in 12 screws and lockwashers (7).
6.
P u t down companion seat (8).
7.
END OF TASK
8-112

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business