|
|
TM 9-2320-211-34-2-1
FRAME 2
1.
Hook up transmission vent line (1) at tee connection (2).
NOTE
Follow-on Maintenance Action Required:
1.
Replace power takeoff (truck M51A2 and trucks
with front winches). Refer to Part 3, para
17-60.
2.
Replace transmission shift lever. Refer to
T M 9-2320-211-20.
3.
R e p l a c e rotochamber (truck M543A 2). Refer
to Part 3, para 17-47.
4.
Replace outer auxiliary release clutch lever
(truck M543A2). Refer to TM 9-2320-211-20.
5.
R e p l a c e clutch actuating link rod assembly.
Refer to TM 9-2320-211-20.
6.
Replace cab floor tunnel and clutch housing
toe board. Refer to TM 9-2320-211-20.
7.
R e p l a c e power takeoff linkage (truck M51A2
and trucks with front winches). Refer to
T M 9-2320-211-20.
Replace hoist pump propeller shaft (truck
8.
M51A2). Refer to TM 9-2320-211-20.
Replace front winch propeller shaft (trucks
9.
with front winches). Refer to TM 9-2320-211-20.
Replace transmission-to-transfer case propeller
10.
shaft. Refer to TM 9-2320-211-20.
11.
Fill transmission. Refer to LO 9-2320-211-12.
END OF TASK
7-106
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |