|
|
TM
9-2320-211-34-2-1
FRAME 2
W o r k i n g under truck, put back wire (1) and nut (2) on starter stud (3).
1.
P u t screw (4) through wire (5) and into starter terminal (6).
2.
NOTE
Follow-on Maintenance Action Required:
R e p l a c e thermal barrier in cab on left side
1.
of firewall (if taken off). Refer to Part 4,
para 19-20.
2.
Replace side access panels. Refer to
TM 9-2320-211-10.
Reconnect battery ground cable at frame.
3.
Refer to TM 9-2320-211-20.
Close hood. Refer to TM 9-2320-211-10.
4.
END OF TASK
6-13
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |