|
|
TM 9-2320-211-34-2-1
FRAME 2
1.
H a n d tighten six nuts (1) with washers (2).
2.
P u t on oil level gage support bracket (3).
3.
H a n d tighten six nuts (4) with washers (5).
4.
T i g h t e n upper and lower nuts (1) to 12 to 15 pound-feet.
5.
T i g h t e n upper and lower nuts (4) to 34 to 39 pound-feet.
6.
P u t on tube (6) and screw on fitting (7). Put in oil gage rod (8).
GO TO FRAME 3
2-156
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |