|
|
TM 9-2320-211-20-3-2
FRAME 2
1.
Aline holes in protective guard (1) with holes in underlip of instrument panel (2).
Push two screws (3) through holes in instrument panel (2) and protective guard
2.
(1).
3. Using wrenches, screw on and tighten two nuts (4).
4. Push two connectors (5) into back of emergency switch (6).
END OF TASK
21-21
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |