|
|
TM 9-2320-211-20-3-2
FRAME 4
Using two pieces of 1/2-inch rope, tie two slings (1) around oil
Soldier A 1.
tank assembly (2) as shown.
Hook up chain hoist (3) to ropes (1).
2.
Using chain hoist (3), raise oil tank assembly (2) up off wrecker
3.
body (4).
Guide oil tank assembly (2) to the ground as soldier A lowers it.
Soldier B 4.
Using chain hoist (3), move oil tank assembly (2) off truck
Soldier A 5.
onto ground.
END OF TASK
18-162
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |