Click here to make tpub.com your Home Page

Page Title: FRAME 3
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-20-3-2
1.
Put on control valve bank assembly cover assembly (1) as shown.
Using flat-tip screwdriver, screw in and tighten five screws (2).
2.
Throw away rags in proper container.
3.
Take out container and put hydraulic fluid into approved disposal area.
4.
NOTE
Follow-on Maintenance Action Required:
1.  Reconnect battery ground cable. Refer to Part 1,
para 7-44.
2.  Service hydraulic hoist system. Refer to
END OF TASK  LO 9-2320-211-12.
18-151

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business