Click here to make tpub.com your Home Page

Page Title: FRAME 2
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-20-3-1
FRAME 2
NOTE
Be sure to tag valve bank hoses before taking them off
so that they will be put back in same place. Place con
tainer under hoses to catch hydraulic fluid drainage.
1.
Using 1 1/2-inch wrench, unscrew and take off seven hose fittings (1).
Let hoses (2) hang.
Using 7/8-inch wrench, unscrew and take off hose (3). Let hose hang.
2.
3.
Using 2-inch wrench, unscrew nut (4). Slide nut back on tube (5).
Using 2-inch wrench, unscrew and take off adapter (6).
4.
5.
Using 1 1/2-inch wrench, unscrew fitting (7). Slide fitting back on tube
(8).
6.
Cap all open hoses (2 and 3), tubes (5 and 8), and fittings (1 and 7).
7.
Using clean rags, wipe up all hydraulic fluid that may have leaked from
hoses (2 and 3).
GO
TO FRAME 3
18-147

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business