|
|
TM 9-2320-211-20-3-2
1.
Raise hook and retract boom. Refer to TM 9-2320-211-10.
2.
Stop engine and prepare crane for travel. Refer to TM 9-2320-211-10.
Using 7/16-inch wrench, unscrew and take out pressure gage (1).
3.
Using 7/16-inch wrench, screw in and tighten pipe plug (2) into valve
4.
bank (3).
NOTE
Follow-on Maintenance Action Required:
Replace valve bank cover. Refer to para 18-22.
END OF TASK
18-143
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |