Click here to make tpub.com your Home Page

Page Title: FRAME 2
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-20-3-2
FRAME 2
1.
Start engine and prepare crane for lifting load. Refer to TM 9-2320-211-10.
Put HOIST lever (1) in DOWN position until hook touches ground.
2.
NOTE
Boom must be all the way out when reading is taken.
Hold CROWD lever (2) in EXTEND position and read pressure on gage (3).
3.
Gage should read 1210 to 1215 psi.
Let go of CROWD lever (2).
4.
IF
GAGE DID NOT READ 1210 TO 1215 PSI, GO TO FRAME 3.
IF
GAGE READ 1210 TO 1215 PSI, GO TO FRAME 4
18-141

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business