|
|
TM 9-2320-211-20-3-2
FRAME 5
Soldier A 1.
Take out hydraulic pressure test gage (1) from valve body (2).
2.
Using 3/8-inch allen wrench, screw in plug (3).
NOTE
Follow-on Maintenance Action Required:
1. Retract boom. Refer to TM 9-2320-211-10.
2. Rewind hoist cable. Refer to TM 9-2320-211-10.
END OF TASK
18-139
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |