|
|
TM 9-2320-211-20-3-2
FRAME 3
Push and hold tubes (1 and 2) on each side of studs (3).
1.
2.
Push on two pads (4).
3.
Put two clamps (5) on studs (3).
4.
Using 9/16-inch wrench, screw on and tighten nuts (6).
5.
Screw coupling nut (7) into nut (8). Using 1 11/16-inch wrench, hold
nut (8) and using 1 1/2-inch wrench, tighten coupling nut (7).
NOTE
Follow-on Maintenance Action Required:
Fill hydraulic reservoir. Refer to LO 9-2320-211-12.
END OF TASK
18-103
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |