Click here to make tpub.com your Home Page

Page Title: FRAME 2
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-20-3-2
FRAME 2
1.
Put tube (1) through hole in gondola panel (2).
2.
Using 1 1/2-inch wrench, screw on and tighten coupling nut (3) on
connector (4).
Using 1 1/2-inch wrench, screw in and tighten coupling nut (5) on
3.
pump-to-valve bank hose (6) into other end of tube (1).
4.
Using 1 1/2-inch wrench, tighten coupling nuts (3 and 5).
5 . Replace valve bank cover. Refer to para 18-22.
NOTE
Follow-on Maintenance Action Required:
Fill hydraulic reservoir.  Refer to LO 9-2320-211-12.
END OF TASK
18-97

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business