|
|
TM 9-2320-211-20-3-2
FRAME 3
1.
Place hose (1) up against block (2).
2.
Put clamp (3) on stud (4).
3.
Using 9/16-inch wrench, screw on and tighten nut (5).
4.
Using 1 1/2-inch wrenches, screw on and tighten coupling nut (6) at
elbow (7).
NOTE
Follow-on Maintenance Action Required:
Fill hydraulic reservoir. Refer to LO 9-2320-211-12.
END OF TASK
18-93
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |