|
|
TM 9-2320-211-20-3-2
FRAME 5
1.
Using hydraulic jack (1), jack up truck until truck is off two trestles (2).
2.
Takeout two trestles (2) and four wood blocks (3).
3.
Using hydraulic jack (1), lower truck onto ground. Take away hydraulic jack.
NOTE
Follow-on Maintenance Action Required:
1. Lubricate shackle pins. Refer to LO 9-2320-211-12.
2. Replace shock absorber. Refer to para 16-6.
3. Replace drag link. Refer to para 14-6.
END OF TASK
16-10
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |