Click here to make tpub.com your Home Page

Page Title: FRAME 2
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-20-3-1
FRAME 2
Put tube clamp (1) on air tube (2).
1.
NOTE
There may be an electrical harness clamp ( 3). If so,
put harness clamp on capscrew (4) before screwing on
nut (5).  If harness had a plastic tie, put on new tie (6).
Using 7/16-inch wrenches, put capscrew (4) through tube clamp (1) and
2.
screw on and tighten nut (5).
NOTE
Follow-on Maintenance Action Required:
1.
Start engine and let it run until air pressure gage
reads between 65 and 120 psi. Refer to
TM 9-2320-211-10.
2.  Stop engine.  Refer to TM 9-2320-211-10.
3. Do air system leak test. Refer to para 1-5.
END OF TASK
12-127

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business