Click here to make tpub.com your Home Page

Page Title: FRAME 5
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-20-3-1
FRAME 5
Hold shield (1) against two brackets (2).  Put two spacers (3) between
1.
shield and each bracket, alining holes.
2.
Put four screws (4) down through two brackets (2).
3.
Put washer (5) on each screw (4) and screw on four nuts (6).
Using 9/16-inch wrenches, hold each screw (4) and tighten nuts (6).
4.
NOTE
Follow-on Maintenance Action Required:
Pressurize air system and check for leaks.
1.
Refer to para 1-5.
2.
Bleed hydraulic brake system. Refer to para 12-14.
END OF TASK
12-86

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business