|
|
TM 9-2320-211-20-3-1
1.
Using pliers, take out cotter pin (1).
Pull out yoke pin (2) and drop down
winch control rod (3).
2.
Using pliers, take out cotter pin (4). Pull out yoke pin (5) with washers
(6) and drop down crane control rod (7).
3.
Using pliers, take out cotter pin (8).
Pull out yoke pin (9) and drop down
power divider control rod (10).
GO TO FRAME 4
10-69
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |