Click here to make tpub.com your Home Page

Page Title: FRAME 2
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-203-1
FRAME 2
Working in cab, push air line (1) through tunnel on right side of transmission
1.
(2).
2.  Using 7/8-inch and 3/4-inch wrenches, screw in and tighten sleeve nut (3) as
tagged. Take off tag.
NOTE
Follow-on Maintenance Action Required:
1.  Put on intermediate cab tunnel cover. Refer to
Part 2, para 17-5.
2.  Put on rear cab tunnel cover. Refer to Part 2,
para 17-5.
END OF TASK
9-8

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business