|
|
TM 9-2320-211-203-1
FRAME 2
Working in cab, push air line (1) through tunnel on right side of transmission
1.
(2).
2. Using 7/8-inch and 3/4-inch wrenches, screw in and tighten sleeve nut (3) as
tagged. Take off tag.
NOTE
Follow-on Maintenance Action Required:
1. Put on intermediate cab tunnel cover. Refer to
Part 2, para 17-5.
2. Put on rear cab tunnel cover. Refer to Part 2,
para 17-5.
END OF TASK
9-8
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |