|
|
TM 9-2320-211-20-3-1
FRAME 3
1.
Line up four mounting screws (1) with holes in instrument panel (2).
2.
Using screwdriver, turn four mounting screws (1) 1/4 turn to right.
NOTE
Follow-on Maintenance Required:
Reconnect battery ground cable. Refer to para 7-44.
NOTE
Functional test must follow battery ground reconnection.
END OF TASK
7-69
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |