Click here to make tpub.com your Home Page

Page Title: FRAME 2
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-20-3-1
FRAME 2
1.
Place light switch (1) into opening in instrument panel (2) from back of
panel.
Line up holes in light switch (1) with holes in instrument panel (2).
2.
Using phillips screwdriver, screw in and tighten four screws (3).
3.
4.
Place three levers (4) on light switch (1).
Using flat-tip screwdriver, screw in and tighten screws (5).
5.
NOTE
Follow-on Maintenance Action Required:
Reconnect battery ground cable. Refer to para 7-44.
END OF TASK
7-44

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business