Click here to make tpub.com your Home Page

Page Title: Inspection and Repair. (AVIM)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM55-1730-215-13 & P
e. Cleaning
(AVIM)
Perform solvent cleaning operations in an
approved cleaning cabinet or in a well-
ventilated area. Keep dry cleaning sol-
vent away from sparks and flames.
Avoid
prolonged breathing of vapors. Avoid eye
and repeated skin contact.
Use approved
personnel protective equipment (eye gog-
gles/face shield/gloves) when handling
solvents.
(1) Clean disassembled parts with dry cleaning solvent (item 4,
Appendix D), and dry with lint-free cloth.
f. Inspection and Repair. (AVIM)
(1) Inspect all seals, gaskets, and packings for evidence of
swelling, tearing, and pitting. Replace any parts found defective.
(2) Inspect valve spindle, pump plunger, and cylinder assembly for
nicks, pitting, and scoring of surfaces. Replace any parts found
defective.
(3) Inspect check ball seats for pitting and roughness. Resurface
these seats if required by applying lapping compound to the ball end of
the appropriate special reseating tool, Appendix E, and rotating back
and forth 90 degrees,  occasionally lifting the tool off the seat.
Repeat this process until a smooth seat surface is obtained.
NOTE
After resurfacing of the check ball seats,
ensure that all abrasive compound is removed
prior to reassembling pump.
g. Reassembly (AVIM)
(1) Install cover gasket
(22) and pump cover (21), and
secure with six bolts (20) .
(2) Install two check ball
bearings (18 and 19), check ball
spring (17), plug gasket (16)
and valve plug (15) .
3-23

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business