|
|
TM 5-5420-279-23
b.
Install
(1)
Fit the load holding valve (4) to the jib cylinder (1) with the four mounting bolts (3).
(2)
Fit the hydraulic pipes (2, 5, 6 and 7).
c.
Follow on tasks
(1)
Check the operation of the crane in accordance with the operator's manual TM 5-5420-
279-10.
(2)
Check for hydraulic leaks.
6-237
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |