TM 5-5420-279-23
1
a.
Remove
(1)
De-pressurize the hydraulic system. See unit maintenance procedure 5-118.
(2)
Note the position of and remove the three hydraulic pipes connected to the flow control
valve (1).
(3)
Remove the flow control valve (1).
(4)
Remove the bolt (2), star washer (3) and washer (4), securing the handle (5) to the flow
control valve (1).
(5)
Note the position of and remove the handle (5).
(6)
Check the hydraulic pipes for damage.
(7)
Check all threaded components for wear and damage.
b.
Install
(1)
Fit the handle (5) in the position noted during removal.
(2)
Apply thread locking compound to the bolt (2).
(3)
Secure the handle (5), with washer (4), star washer (3) and bolt (2).
(4)
Align the flow control valve (1) with the hydraulic pipes.
(5)
Fit the hydraulic pipes in the positions noted during removal.
c.
Follow on tasks
(1)
Check the operation of the stabilizer extensions and stabilizer legs.
(2)
Check the operation of the crane.
(3)
Check for leaks.
6-205
|