|
|
TM 5-5420-279-23
a.
Remove
(1)
Remove the four screws (2) securing the operator's control panel cover (3).
(2)
Using the wiring diagram provided at appendix J, note the positions of the wiring to the
control panel cover.
(3)
Remove the electrical cable (1) from the control panel.
(4)
Remove the four nuts screws and washers securing the control panel to the crane column.
(5)
Check all electrical cables for chafing and damage.
(6)
Check all threaded components for wear and damage.
(7)
Replace components as required.
b.
Install
(1)
Fit the control panel to the crane column with four nuts screws and washers.
(2)
Fit the electrical cable (1) to the control panel.
(3)
Connect the wiring to the control panel cover (2) in the positions noted during removal.
(4)
Fit the control panel cover (3) with four screws (2).
c.
Follow on tasks
(1)
Switch the battery shutoff switch to the on position.
(2)
Check the operation of the crane.
(3)
Check the operation of all lights and switches on the operator's control panel.
6-199
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |