|
|
TM 5-5420-279-23
a.
Remove
(1)
De-pressurize hydraulic system. Refer
to unit maintenance procedure 5-118.
(2)
Remove the hydraulic pipes (4), (5)
and (6) connected to the jib cylinder
(3).
(3)
Remove the electrical harness (7)
connected to the jib cylinder.
(4)
Remove the upper cylinder pin snap
9
10
ring (not shown).
(5)
Remove the set screws (9).
8
(6)
Note the orientation of and remove the
4
stop mechanical (10).
5
(7)
Support the weight of the jib cylinder
(3) and remove the upper cylinder pin
(8). Note the position of and retain the
spacers that are fitted between the jib
cylinder (3) and the boom (1).
(8)
Remove the lower cylinder pin snap
ring (not shown).
7
(9)
Remove the set screws (11).
(10)
Note the orientation of the stop
mechanical (12) and remove.
6
14
(11)
Remove the lower cylinder pin (13).
Note the position of and retain the
spacers that are fitted between the jib
13
cylinder (3) and the linkage (14).
(12)
Remove the jib cylinder (3).
12
11
(13)
Check the set screws, stops
mechanical and spacers for damage
and wear.
(14)
Check hydraulic hoses for chaffing or
crush damage.
(15)
Replace components as necessary.
b.
Install
(1)
Locate the Jib Cylinder (3) in the Crane Base (2).
(2)
Locate the Lower Pin Spacers in the positions noted during removal and insert the Lower
Cylinder Pin (13).
(3)
Align the slot in the lower cylinder pin (13).
(4)
Insert the stop mechanical (12) as noted during removal.
(5)
Secure the stop mechanical in place with the set screws (11).
6-159
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |