Click here to make tpub.com your Home Page

Page Title: Remove
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
NOTE
The Boom must be lifted away from the Crane Base to allow access to the Lifting Cylinder.
The boom must then be supported throughout the lifting Cylinder replacement procedure.
a.
Remove
(1)
De-pressurize hydraulic system. Refer to procedure 5-118.
(2)
Remove the hydraulic pipes (4) and (5) connected to the lifting cylinder (3).
(3)
Remove the electrical harness (6) and (7) connected to the lifting cylinder.
(4)
Remove the upper cylinder pin (8) snap ring (not shown).
(5)
Remove the set screws (9).
(6)
Note the orientation of the stop mechanical (10) and remove.
(7)
Support the weight of the lifting cylinder (3) and remove the upper cylinder pin (8). Note the
position of and retain the linkage and cylinder spacers that are fitted between the linkage
the lifting cylinder (3).
(8)
Remove the lower cylinder pin snap ring (not shown).
(9)
Remove the set screws (11).
(10)
Note the orientation of the stop mechanical (12) and remove.
(11)
Remove the lower cylinder pin (13). Note the position of and retain the spacers that are
fitted between the crane base (2) and the lifting cylinder (3).
(12)
Remove the lifting cylinder (3).
(13)
Check the set screws, stops mechanical and spacers for damage and wear.
(14)
Check hydraulic hoses for chaffing or crush damage.
(15)
Replace components as necessary.
b.
Install
(1)
Locate the lifting cylinder (3) in the crane base (2).
(2)
Locate the lower pin spacers in the positions noted during removal and insert the lower
cylinder pin (13).
(3)
Align the slot in the lower cylinder pin (13).
(4)
Insert the stop mechanical (12) as noted during removal.
(5)
Secure the stop mechanical in place with the set screws (11).
(6)
Fit the snap ring to the opposite end of the lower cylinder pin (13).
(7)
Locate the upper pin spacers in the positions noted during removal and insert the upper
cylinder pin (8).
(8)
Align the slot in the upper cylinder pin (8).
(9)
Insert the stop mechanical (10) as noted during removal.
(10)
Secure the stop mechanical in place with the set screws (9).
(11)
Fit the snap ring to the opposite end of the upper cylinder pin (8).
(12)
Connect the hydraulic pipes (4) and (5) to the lifting cylinder (3).
(13)
Connect the electrical harness (6) and (7) to the lifting cylinder (3).
6-155

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business