Click here to make tpub.com your Home Page

Page Title: Install-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
NOTE
To ensure that the Rope is tensioned from the Din Wedge for layering, attach the Rope end
to a mobile load.
To avoid rotary tension, connect the Rope end to the mobile load using a swivel
connection.
(6)
Operate the winch slowly and ensure that the rope (2) is fed onto the winch drum (1) neatly
in layers.
(7)
When the fitted eye end of the rope (2) approaches the fixed pulley, disconnect the eye
end from the mobile load.
(8)
Manually tension the rope at the free eye end and withdraw the shoot bolts (4) that connect
the lower pulley block (5) to the far bank carriage.
(9)
Lower the far bank carriage lower pulley block (5) and support it on a suitable cradle.
(10)
Remove the rope guide nearest the home bank carriage in the far bank carriage lower
pulley block by removing 2-cap head screws. See unit maintenance procedure 5-068. This
permits the eye end on the rope to pass through.
(11)
Feed the eye end of the rope (2) up through the lower pulley block (5), taking care the rope
does not become tangled with the slings, and refit the rope guide.
(12)
Secure the rope (2) to the rope termination point (6) on the far bank carriage using the pin
(9), locking plate (8) and cap head screws (7).
(13)
Raise the lower pulley block (5) by operating the winch (10) and attach the lower pulley
block (5) to the far bank carriage using the shoot bolts (4).
6-52

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business