TM 5-5420-279-23
NOTE
To ensure that the Rope is tensioned from the Din Wedge for layering, attach the Rope end
to a mobile load.
To avoid rotary tension, connect the Rope end to the mobile load using a swivel
connection.
(6)
Operate the winch slowly and ensure that the rope (2) is fed onto the winch drum (1) neatly
in layers.
(7)
When the fitted eye end of the rope (2) approaches the fixed pulley, disconnect the eye
end from the mobile load.
(8)
Manually tension the rope at the free eye end and withdraw the shoot bolts (4) that connect
the lower pulley block (5) to the far bank carriage.
(9)
Lower the far bank carriage lower pulley block (5) and support it on a suitable cradle.
(10)
Remove the rope guide nearest the home bank carriage in the far bank carriage lower
pulley block by removing 2-cap head screws. See unit maintenance procedure 5-068. This
permits the eye end on the rope to pass through.
(11)
Feed the eye end of the rope (2) up through the lower pulley block (5), taking care the rope
does not become tangled with the slings, and refit the rope guide.
(12)
Secure the rope (2) to the rope termination point (6) on the far bank carriage using the pin
(9), locking plate (8) and cap head screws (7).
(13)
Raise the lower pulley block (5) by operating the winch (10) and attach the lower pulley
block (5) to the far bank carriage using the shoot bolts (4).
6-52
|