Click here to make tpub.com your Home Page

Page Title: Install
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
(5)
Remove the LBD top cover (2). Refer to unit maintenance procedure 5-035.
(6)
Remove the socket head screws securing the rear guard (3) to the LBD.
(7)
Remove the rear guard (3).
(8)
Support the weight of the LBD (1) using a crane and lifting slings.
(9)
Note the position of the hydraulic hoses (4) attached to the LBD manifold assembly (5) and
disconnect them.
(10)
Disconnect the articulator cylinders (6) upper mounting from the LBD pivot shaft (7). Refer
to unit maintenance procedure 5-050.
(11)
Release the rear pinch roller by turning the rear pinch roller pressure release tap through
90 degrees.
(12)
Remove and retain the socket head screws (8) securing the LBD locking collars (9) to the
pivot shaft (7).
(13)
Remove the locking collars (9).
(14)
Remove the pivot shaft (7).
(15)
Remove the LBD and place on a suitable level working surface.
(16)
Examine all components for damage and wear.
(17)
Examine the LBD frame pivot shaft bearings (10) for damage and wear.
(18)
Replace damaged or worn components as required.
b.
Install
(1)
Position the LBD assembly on the launch frame. Support the weight of the LBD using the
crane and lifting slings.
(2)
Fit suitable dunnage to keep the LBD level.
(3)
Fit the pivot shaft (7) through the launch frame and the LBD (1).
(4)
Fit the locking collars (9).
(5)
Apply thread-locking compound to the threads of the locking collar socket head screws (8).
(6)
Secure the locking collars (9) with the locking collar socket head screws (8).
(7)
Fit the articulator cylinders (6) as detailed in unit maintenance procedure 5-050.
(8)
Re-connect the hydraulic hoses (4) to the LBD manifold assembly (5) in the positions noted
during Remove.
(9)
Remove the lifting slings and crane.
(10)
Fit the rear guard (3) to the LBD (1).
(11)
Fit the LBD top cover (2). Refer to unit maintenance procedure 5-035.
(12)
Remove the dunnage.
(13)
Turn the rear pinch roller pressure release tap through 90 degrees.
c.
Follow on task
(1)
Operate the LBD, check for correct operation and hydraulic oil leaks.
6-34

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business