Steps 8 through 14 will have to be done to each hinge of the lower center beam.
a.
Remove
(1)
Remove the A-Frame from the launch vehicle. See direct support maintenance procedure
6-006.
(2)
Remove the support struts. See unit maintenance procedure 5-027.
(3)
Remove the folding cylinders. See unit maintenance procedure 5-014.
(4)
Remove the shoot bolt assemblies. See unit maintenance procedure 5-026.
(5)
Remove the limit switches. See unit maintenance procedure 5-023.
(6)
Remove the stabilizer manifold. See direct support maintenance procedure 6-002.
(7)
Disconnect any brackets that retain hydraulic pipes or electrical cables to the lower center
beam.