|
|
TM 5-5420-279-23
(7)
Connect electrical harness to vehicle main junction box. Re-attach to chassis where
appropriate.
(8)
Connect hydraulic plug-in couplings.
(9)
Connect handset. Re-start launcher electric and hydraulic systems
(10)
Rotate tail lift to an upward position until slings slacken.
(11)
Disconnect lifting slings.
(12)
Exercise tail lift hydraulics and check all functions are working safely and correctly.
(13)
Stow tail lift and prepare launcher for transport.
f.
Launch Equipment Removal
To remove the launch frame from the launch vehicle for rail or air transport proceed as follows:
NOTE
The numbers on the figures refer to the Sub Paragraph numbers of the text.
(1)
Remove the R clips securing the removable mudguards, release the shootbolts and
remove mudguards.
5-474
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |