|
|
TM 5-5420-279-23
2
1
3
4
5
4
a.
Remove
(1)
De-pressurize the system. Refer to unit maintenance procedure 5-118.
(2)
Remove the cotter pin and stabilizer pin from the cross connection assembly top mounting
(1) and break loose the hydraulic hoses.
(3)
Remove the four mounting bolts, nyloc nuts and washers (5). Discard the nyloc nuts.
(4)
Note the position of and remove the electrical connections attached to the electrical unit (4)
on the back of the cross connection assembly (2).
5-336
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |