|
|
TM 5-5420-279-23
(2)
Remove the sixteen screws and washers (3) securing the operator's panel (4) to the
interface enclosure (1).
(3)
Remove to one side, and support, the operator's panel (4).
(4)
Remove the cable ties securing the two harnesses and twelve plugs to the operator's panel
(4).
(5)
Using a suitable marker, mark the twelve plugs and their positions on the operator's panel
(4).
(6)
Remove the operator's front panel (4).
b.
Install
(1)
Fit new cable ties to the operator's panel (4).
(2)
Fit the harnesses to the operator's panel (4) in the positions noted during removal.
(3)
Fit the twelve plugs in the positions marked during removal.
(4)
Fit the operator's panel (4) to the interface enclosure (1) and secure in place with the
sixteen screws and washers (3).
c.
Follow on tasks
(1)
Switch the battery shutoff switch to the on position.
(2)
Operate the launcher and check the bridge for correct operation.
5-316
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |