Click here to make tpub.com your Home Page

Page Title: Remove
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
a.
Remove
(1)
De-pressurize hydraulic system. Refer to unit maintenance procedure 5-118.
(2)
Release the hydraulic pressure in the cylinder refer to unit maintenance procedure 5-123.
(3)
Starting at the cross member end of the rotate cylinder (1).
(4)
Remove the nuts and bolts (2) securing the energy chain brackets (3) to the rotate cylinder
(1).
(5)
Remove one half of the energy chain bracket (3).
(6)
Remove the two bolts and lock washers (4) and remove the locking plate (5). Discard the
lock washers.
(7)
Note the position of and remove the two hydraulic hoses (7) connected to the rotate
cylinder (1).
(8)
Move to the A-Frame end of the rotate cylinder (1).
(9)
Remove the nuts and bolts (8) securing the energy chain brackets (9) to the rotate cylinder
(1).
(10)
Remove one half of the energy chain bracket (9).
NOTE
The pivot pin locking plate is part of the energy chain bracket (11).
(11)
Remove the two bolts and lock washers (10) and remove the pivot pin locking plate/energy
chain bracket (11). Discard the lock washers.
(12)
Support the weight of the rotate cylinder (1).
(13)
Remove the rotate cylinder pivot pins (6 and 12).
(14)
Remove the rotate cylinder (1).
(15)
Inspect components for damage and corrosion.
(16)
Examine flats and threads for damage.
(17)
Replace components as required.
b.
Install
NOTE
The following install procedures contain the call outs for both the cross member and
A-Frame ends of the rotate cylinder, use the call outs as applicable.
(1)
Position the rotate cylinder (1) and insert the rotate cylinder pivot pins (6 and 12).
(2)
Fit the rotate cylinder locking plates (11 and 5).
(3)
Apply thread locking compound to the bolts (10 and 4).
(4)
Secure the pivot pin locking plates (11 and 5) with the washers and bolts (10 and 4).
(5)
Fit the energy chain brackets (3 and 9) and secure in place with bolts and nuts (8 and 2).
(6)
Fit the two hydraulic hoses (7) to the positions noted during removal.
c.
Follow on task
(1)
Operate the rotate cylinders in accordance with the operator's manual TM 5-5420-279-10.
5-258

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business